Content
Basic Structure:
INTRODUCTION
• Contextualize the DFSS methodology: why it was created, applications, benefits, comparison to DMAIC
• Differences between DMAIC vs DMADV
• When to use DMADV?
- Financial Benefits of DMADV Projects:
- Relation between DMADV and PMI
**Definition**
• How to identify a DFSS projects
• Defining the Project scope
• Risk Management Plan
• Multigenerational Plan (PM’s)
• Project Schedule / Gantt Diagram
• Project Contract
**Measurement**
• Identify the customers and their needs
• Translate the needs into Project Requirements (CTQ)
• Prioritize CTQ’s
• VOC (‘Voice of Customer’) & VOB (“Voice of Business”)
• CTQ’s / CTP’s
• Affinity Diagram / Structure Tree
• Plan of customers data collection: researches, interviews, Focus Group
• Benchmarking
• Analysis of needs: ANOM assessment & Activities Table;
• Quality Functional Deployment (QFD)
• CTQ’s Risk Matrix
• Kano Matrix
• Design Thinking
**Analyze**
• Develop Design Concepts
• Assess and Choose the Best Design
**Design**
• Develop High Level Design
• Develop Detailed Design
• Test and Verify the Detailed Design
• Prepare Pilot Plan
• Description of Detailed Project
• QFD Levels 3 and 4
• FMEA (DFMEA & PFMEA)
• Logistics Regression
• Monte Carlo Simulation
• Experiment Design Principles (DOE)
• Fractioned Factorial Experiment Design Principles
• Pilot Planning
• Reliability
• Control Plan
• Poka-yokeVERIFY
• Drive the Pilot Plan
• Implement New Design / Hand it to the Process Owner
• SPC (Statistical Plan Control)
• PDCA /SDCA
• Assessment
**Workload:** 40 hours
**Pre-Work:** Prepare topics to be worked in the class
**NOTE: ** Minitab software used for statistical analysis